Document
Date Created
1971-09
Publisher
Minnesota Department of Highways
Format
Description
The recommendation of this report is to proceed with development of the Bus-Metered Freeway System in the I-35W Corridor. Analysis of the concept, the engineering detail, the operations, and the cost indicates the feasibility of combining a freeway surveillance and control system (a proven concept) and freeway express bus system (a proven concept).
Keywords
Collection Name
File Type
Content Statement
This item was digitized from the original print text.
Physical Location
MnDOT Library
Persistent Link
https://hdl.handle.net/20.500.14153/mndot.16658

Supporting Item

No items.