Document
Date Created
1973-10
Publisher
Minnesota Department of Transportation
Format
Description
The general intent of the project is to scientifically test the capability of a low-capital cost improvement as a means of optimizing the "people carrying capability" of a radial corridor from a CBD. For the project, the following five goals were identified:
- Minimize the peak hour congestion and accidents within the I-35W corridor.
- Optimize the "people carrying" capability of the I-35W corridor.
- Ensure that this project's results are applicable to other urban corridors here and elsewhere.
- Respond to the socio-economic needs of the residents and users of the corridor.
- Test the bus on metered freeway system as a fast link element within the family of vehicles concept.
- Minimize the peak hour congestion and accidents within the I-35W corridor.
- Optimize the "people carrying" capability of the I-35W corridor.
- Ensure that this project's results are applicable to other urban corridors here and elsewhere.
- Respond to the socio-economic needs of the residents and users of the corridor.
- Test the bus on metered freeway system as a fast link element within the family of vehicles concept.
Collection Name
File Type
Rights Statement
Content Statement
This item was digitized from the original print text.
Scanning Center
Physical Location
MnDOT Library
Persistent Link
https://hdl.handle.net/20.500.14153/mndot.16657