Displaying results 1 - 1 of 1
Results per page
10
25
50

Night Maintenance Pilot Program: Mn/DOT District 5: Summer 1986

Image
Date Created
1986-10
Description
The main objective of performing night maintenance is to provide the necessary work at minimal inconvenience to the driving public. Jobs were scheduled in advance and for the most part were located within the 494/694 "beltline" along high volume, major freeway corridors, wherever Appendix B (traffic control standards) require a double left or double right lane closure. Note: center lane only closures are no longer permitted. Some emergency jobs were also done by the night maintenance crews such as guardrail repairs and pavement "blowup" repairs.