Document
Date Created
1986-10
Publisher
Minnesota Department of Transportation
Format
Description
The main objective of performing night maintenance is to provide the necessary work at minimal inconvenience to the driving public. Jobs were scheduled in advance and for the most part were located within the 494/694 "beltline" along high volume, major freeway corridors, wherever Appendix B (traffic control standards) require a double left or double right lane closure. Note: center lane only closures are no longer permitted. Some emergency jobs were also done by the night maintenance crews such as guardrail repairs and pavement "blowup" repairs.
Collection Name
File Type
Rights Statement
Content Statement
This item was digitized from the original print text.
Physical Location
MnDOT Library
Persistent Link
https://hdl.handle.net/20.500.14153/mndot.17462

Supporting Item

No items.