Document
Creator
Date Created
2010
Publisher
Minnesota Department of Transportation
Format
Description
The winter performance of the SafeLane commercial overlay system has been evaluated at four installations on bridge decks in the state of Minnesota. The study was conducted over a period of a total of three years. Analyses included mechanical and chemical testing of the components, chloride analysis as a function of depth, friction by skid test and visual inspection. At one site plow operator's comments were gathered to access retention of deicing chemicals from event to event. All sites were included in a comparison of accident frequency before and after overlay installation.
Keywords
Collection Name
Series
Report Number
2010-13
File Type
Object File Name
201013.pdf
Rights Statement
Physical Location
MnDOT Library
Persistent Link
https://hdl.handle.net/20.500.14153/mndot.2819