Document
Date Created
1974
Publisher
Minnesota Department of Highways
Format
Description
In 1973, a planned extension to Interstate 94 between I-694/494 and the St. Croix River was cancelled due to concerns raised by residents. This study is part of a restudy that was ordered by the Commissioner of Highways to find the best route for the freeway, taking in to account the resident's concerns. This report focuses on the locations of the proposed rest stops, information centers, and weigh areas.
Collection Name
File Type
Content Statement
This item was digitized from the original print text.
Physical Location
MnDOT Library
Persistent Link
https://hdl.handle.net/20.500.14153/mndot.14511

Supporting Item

No items.