Displaying results 1 - 2 of 2
Results per page
10
25
50

Maintenance Area 9A Snow and Ice Removal Plan: Winter 1968-69

Image
Date Created
1969
Description
The primary objective of the 1968-69 Snow and Ice Control Plan is to provide for safe and efficient movement of traffic within the district commensurate with the available funds, manpower and equipment. A secondary objective is to protect the investment that the motorists of the State of Minnesota have in the road structure, signs, bridges, guardrail etc. which may become damaged or destroyed if proper snow and ice removal practices are not performed.

Maintenance Area 9A Snow and Ice Removal Plan: Winter 1969-70

Image
Date Created
1969
Description
The primary objective of a Snow and Ice Control Plan is to provide for safe and efficient movement of traffic within the district commensurate with the available funds, manpower and equipment. A secondary objective is to protect the investment that the motorists of the State of Minnesota have in the road structure, signs, bridges, guard rail, etc. which may become damaged or destroyed if proper snow and ice removal practices are not performed. All attempts will be made to provide the following: 1. Snow and Ice removal service seven days a week on a 24 hour "On Call" basis. 2. Movement of traffic at all times but. at reduced speeds during the storm periods. 3. Bare pavements within 12 hours after cessation of the snowfall. 4. Cleanup and completion of preparation for the next storm within 5 days after a given storm.