Document
Creator
Date Created
1972
Publisher
Minnesota Department of Highways
Format
Description
The removal of snow and ice from our roadways has had considerable discussion as to proper procedures for several years. In the past, the traveling public expected some delays in snow and ice removal, but now, the "bare pavement" is expected or rather demanded shortly after any storm.
The transportation system is an extremely important cog in our economy. Timetables must be met; getting to work on time and meeting equipment and material deadlines are major factors of this timetable.
To ensure effective and efficient snow and ice removal and preserve the ecology of the area, a well arranged plan must be developed to provide such service.
The transportation system is an extremely important cog in our economy. Timetables must be met; getting to work on time and meeting equipment and material deadlines are major factors of this timetable.
To ensure effective and efficient snow and ice removal and preserve the ecology of the area, a well arranged plan must be developed to provide such service.
Keywords
Collection Name
Series
File Type
Rights Statement
Content Statement
This item was digitized from the original print text.
Scanning Center
Physical Location
MnDOT Library
Persistent Link
https://hdl.handle.net/20.500.14153/mndot.17556