Document
Creator
Date Created
1976-01
Publisher
Minnesota Department of Highways
Format
Description
A task force composed of personnel from the Offices of Bridges and Structures, Materials, Research and Standards has reviewed and analyzed existing procedures for protection of bridge decks.
The objectives of the task force were:
1. To develop policy for installation of protective systems on new bridge decks.
2. To develop policy for establishing priorities and selecting methods for contract restoration and protection of in-service bridge decks.
3. To develop policy for systematic maintenance utilizing M.H.D. forces, for the preservation of in-service bridge decks which are not being considered for contract restoration.
The objectives were set to protect the bridge deck investment in a cost-effective manner and within budget limitations.
The objectives of the task force were:
1. To develop policy for installation of protective systems on new bridge decks.
2. To develop policy for establishing priorities and selecting methods for contract restoration and protection of in-service bridge decks.
3. To develop policy for systematic maintenance utilizing M.H.D. forces, for the preservation of in-service bridge decks which are not being considered for contract restoration.
The objectives were set to protect the bridge deck investment in a cost-effective manner and within budget limitations.
Keywords
Collection Name
File Type
Rights Statement
Scanning Center
Physical Location
MnDOT Library
Persistent Link
https://hdl.handle.net/20.500.14153/mndot.17645