Before pavement construction, crews test roll the soil that will act as the pavement subgrade by towing a two-wheeled vehicle of known weight over the soil and measuring the depth to which its wheels penetrate the soil. If this depth exceeds a Mn/DOT-
specified limit, the subgrade must be further compacted before it is considered
acceptable for placing the road’s aggregate base.
specified limit, the subgrade must be further compacted before it is considered
acceptable for placing the road’s aggregate base.